1Understand what an indicator is
An indicator is a quantitative or qualitative measure used to track progress towards an intended result and assess whether that result has been achieved.
An indicator does not describe what a project intends to achieve. Rather, it identifies what will be measured to determine whether the intended result has occurred.
For example:
| Result statement | Indicator |
|---|---|
| Improved capacity of government officials to formulate climate policies | Percentage of participating officials demonstrating the required knowledge and skills in a post-training assessment |
| Increased application of climate policy knowledge | Percentage of trained officials applying acquired knowledge in their policy-related work |
| Increased adoption of climate-resilient policies | Number of participating countries adopting climate-resilient policies consistent with agreed criteria |
Key principle
Formulate the result first, then identify the indicator. Do not formulate a result simply because certain data are easy to collect.
2Clarify the intended result
Before formulating an indicator, examine the result statement and ask:
- What specific change or achievement is expected?
- Who or what is expected to change?
- Is the result at the output, outcome or impact level?
- What observable evidence would demonstrate that the result has been achieved?
The indicator must correspond to the level of the intended result.
| Results level | Intended result | Possible indicator |
|---|---|---|
| Output | Farmers have acquired the knowledge and skills to operate solar dryers | Percentage of trained farmers who demonstrate correct operation of solar dryers |
| Outcome | Farmers regularly and effectively use solar drying technology | Percentage of beneficiary farmers regularly using solar dryers according to agreed operating standards |
| Impact | Increased household income and reduced post-harvest food waste | Percentage change in household income from dried products; percentage reduction in post-harvest losses |
A frequent mistake is using an activity indicator to measure a result. For example, the number of farmers trained measures training delivery, but does not demonstrate whether farmers acquired skills or subsequently applied them.
3Identify what needs to be measured
Once the intended result is clear, determine which aspect of performance or change should be measured.
Consider the following dimensions:
| Dimension | What it measures | Example |
|---|---|---|
| Quantity | Number or amount | Number of policies adopted |
| Quality | Standard or degree of achievement | Percentage of trainees meeting competency standards |
| Behaviour | Changes in practice | Percentage of farmers regularly using solar dryers |
| Institutional change | Changes in systems and procedures | Number of institutions routinely applying new planning guidelines |
| Policy change | Adoption or implementation of policy measures | Number of countries implementing an agreed policy framework |
An indicator may measure one or more dimensions. Select the dimensions most relevant to the intended result.
Both quantitative and qualitative evidence can be used. For example, a qualitative assessment of policy implementation may use a defined rating scale supported by documentary evidence and stakeholder interviews.
4Formulate the indicator using SMART criteria
Good indicators should meet the SMART criteria.
| Criterion | Meaning | Question to ask |
|---|---|---|
| S – Specific | Clearly defines what is being measured | Is the indicator precise and unambiguous? |
| M – Measurable | Can be quantified or verified through evidence | Can reliable data be collected? |
| A – Achievable | Measurement is feasible within available capacity and resources | Can the indicator realistically be measured? |
| R – Relevant | Directly linked to the intended result | Does it measure the change or achievement we want to assess? |
| T – Time-bound | Has a defined measurement period | When will the indicator be measured? |
In applying SMART, it is important to distinguish the indicator from its target. The indicator defines what will be measured; the target specifies the desired level of achievement by a particular time.
5Establish baselines and targets
An indicator becomes more useful when accompanied by a baseline and target.
- Baseline: The situation or value of the indicator before the intervention, or at an agreed starting point.
- Target: The desired value of the indicator to be achieved by a specified time.
For example:
| Indicator | Baseline | Target | Measurement |
|---|---|---|---|
| Percentage of beneficiary farmers regularly using solar dryers | 0% | 80% | One year after project completion |
| Percentage of trainees demonstrating correct operation | 0% | 100% | At project completion |
| Number of solar dryers installed according to standards | 0 | 10 | At project completion |
Targets should be realistic yet sufficiently ambitious, taking account of available resources, implementation conditions, past performance and relevant risks.
If a baseline is unavailable, identify how it will be established. Avoid automatically assuming a baseline of zero, particularly for indicators measuring existing knowledge, practices or institutional capacities.
6Define how each indicator will be measured
Formulating an indicator is not complete until the method of measurement has been established.
For each indicator, specify the required data, sources, collection methods, frequency, responsible person or institution, and resources.
Practical tool: Indicator measurement plan
| Element | Guiding question | Example |
|---|---|---|
| Indicator | What will be measured? | Percentage of farmers regularly using solar dryers |
| Definition | What qualifies as regular use? | At least four uses per month during harvest season |
| Data required | What information is needed? | Number of regular users and total beneficiary farmers |
| Data sources | Where will the information come from? | Beneficiary records, farmer interviews |
| Collection method | How will data be obtained? | Survey and site visits |
| Timing | When will data be collected? | Baseline and 12 months after completion |
| Responsibility | Who will collect the data? | Project M&E officer |
| Resources | What will measurement cost? | Staff time, travel and survey costs |
When measuring changes in knowledge, attitudes, institutional capacity or policy implementation, consider using surveys, interviews, documentary evidence and direct observation, as appropriate.
7Review and improve the proposed indicators
Before finalizing indicators, bring together relevant programme staff, implementing partners and other stakeholders to review them.
Ask whether the indicators:
- Adequately represent the intended results.
- Meet the SMART criteria.
- Capture changes rather than simply activities.
- Are feasible to measure with available resources.
- Can provide credible evidence for decision-making.
- Are sufficiently limited in number to avoid excessive reporting burdens.
8Avoid common mistakes
| Common mistake | Recommended practice |
|---|---|
| Selecting indicators because data are readily available | Start with the intended result and identify the most meaningful measure |
| Confusing activities with results | Measure changes in knowledge, behaviour, institutional practices or conditions |
| Using vague terms such as improved, enhanced or strengthened | Define observable characteristics or measurable standards |
| Selecting too many indicators | Use a manageable number that captures the most important aspects of each result |
| Using perception data as proof of actual behavioural change | Verify reported changes through records, observation or other evidence where feasible |
| Omitting baselines and targets | Establish starting values and desired levels of achievement |
| Failing to define data collection arrangements | Specify sources, methods, timing, responsibilities and costs |
9Final checklist
Before adopting the indicator, confirm that:
Key message
A good indicator is not necessarily the easiest one to measure. It is the one that provides meaningful, credible and timely evidence about whether the intended result is being achieved.